A 69.3 MW wind project in Gujarat

See how a wind farm in Sayla is estimated to avoid more than 2.3 million tonnes of CO2e over 10 years.

Utility-scale wind for the Indian grid

The Sayla project generates electricity from wind turbines in the Surendranagar district of Gujarat. It produces about 246,348 MWh a year, and each unit displaces fossil-fuel generation on the grid.

  • Project scope
    69.3 MW grid-connected wind power
  • Key stakeholders
    Consulting partner: Infinite Solutions. Project developer: Name withheld for confidentiality
  • Project duration
    25-year operational life, 10-year crediting period
  • Registry and methodology
    GCC & ACM002 : Grid-connected electricity generation from renewable sources

Emissions avoided, year after year

69.3 MW
Installed capacity
Grid-connected wind
246,348 MWh
Estimated generation per year
Approximate
Above 40%
Plant load factor
Annual average
230,384
tCO2e avoided per year
Estimated
2.3M+
tCO2e over crediting period
Estimated, 10 years
25 years
Operational life
10-year crediting period

From fossil-fuel power to wind at scale

Follow a wind project from design to a 10-year crediting period.

01 The challenge

A grid that needs cleaner power

New wind capacity counts for the climate only when it displaces fossil-fuel generation on the grid. A plant this size also has to keep performing for its 25-year life, not only in its first year.

02 The approach

Wind generation measured against the grid

The project feeds about 246,348 MWh a year into the grid from 69.3 MW of wind capacity. The reductions are estimated at about 230,384 tCO2e a year, with credits earned over a 10-year period.

1
Wind generation at 69.3 MW
2
Grid-connected supply
3
Fossil generation displaced
4
10-year crediting period

03 Delivery

A plant load factor above 40%

The plant runs at a plant load factor above 40% and is designed for a 25-year operational life. Over the 10-year crediting period, it is estimated to avoid more than 2.3 million tonnes of CO2e.

2023

Crediting period begins

The 10-year period starts on 2023.
2033

Crediting period ends

The 10-year period closes on 2033.